About the Client

A leading enterprise in India’s steel & mining sector, engaged in large-scale manufacturing and mineral production, frequently moves ductile iron (DI) pipes to various distribution points across the country. With steady dispatch volumes and time-bound movements, logistics plays a critical operational role in maintaining delivery continuity and competitive landed cost.
For their freight movement requirement from CSP → Manesar, Gurgaon the client needed a fast, transparent, and market-aligned process to finalize transport allocation.
Business Challenges

Despite being an industry leader, the organization faced recurring inefficiencies in logistics awarding:

ChallengeImpact
Fragmented price negotiationsLonger decision cycles, more back-and-forth discussions
Limited visibility of price competitivenessDifficulty comparing quotations or benchmarking against market
High per-tonne cost due to scattered negotiationsIncreased logistics spend and reduced cost efficiency
Need for rapid lane closureManual coordination delayed award and dispatch planning

The procurement team required a single-window, time-efficient mechanism to evaluate carrier bids and finalize allocation without multiple negotiation loops.

Solution: TransportTek in Action

To overcome negotiation and pricing challenges, the team executed a real-time reverse auction on TransportTek for DI pipe transportation.

What Was Done

  • A price-based auction model was configured for the CSP → Manesar route.
  • Only pre-qualified and verified transporters were invited to ensure reliability.
  • Live competition was enabled using ₹30 decrement steps with automatic ranking.
  • Procurement could monitor live bids, compare offers, and finalize instantly.
  • The entire process was completed with full audit trail and transparent revision logs.

Why This Worked

TransportTek replaced manual negotiations with real-time digital price discovery, allowing the client to:

  • Achieve competitive pricing
  • Speed up procurement closure
  • Make decisions based on transparent bid visibility
Results

Auction Outcome Snapshot

MetricsAchieved Value
Auction Duration51 minutes
Total Quantity Awarded12 tonnes
Starting Price₹5,000/tonne
Winning Bid₹3,590/tonne
Savings Secured28.20%

The lane that previously required multiple negotiation rounds was closed in one single event, with immediate price clarity and best-rate award.

Impact:

The shift to digital auctioning transformed the client’s logistics sourcing approach.

Business Value Delivered

  • 28.20% cost saving achieved instantly
  • No manual renegotiation after event closure
  • Award decisions completed within 51 minutes
  • Procurement finalized optimal carrier at transparent market price
  • Client now moving repeat DI dispatches via TransportTek for cycle-time reduction

This success validated digital auctioning as an operational advantage - enabling the client to scale TransportTek for additional pipe lanes, improving response speed, market competitiveness, and unit cost efficiency.

Other Success Stories

Maximizing Returns: ValueTek’s Digital Auctions Unlocked ₹87 Lakh from Wood Scrap
ValueTek

Maximizing Returns: ValueTek’s Digital Auctions Unlocked ₹87 Lakh from Wood Scrap

Achieving 16.58% Value Enhancement in Refractory Bricks through Market-Aligned Digital Auctions
ValueTek

Achieving 16.58% Value Enhancement in Refractory Bricks through Market-Aligned Digital Auctions

Office Fit-Out Sale for a leading manufacturing Company’s Corporate Office at Chennai , AssetTek, Matex Technologies
Category logo

Navigating the Challenges of Pandemic: How Matex Facilitated a Successful Office Fit-Out Sale for a leading manufacturing Company’s Corporate Office at Chennai

Matex Newsletter

New Releases · Seasonal Promotions · News